
We had to cut the PVC pipe in order to use the pipe snake.

Besides the clog, we also had to empty the septic tank (thankfully it was before the blizzard, or we would have had a lot of snow to move!!)

The new clean out valve

Sarah also lost another tooth that day (her 3rd)

William with the last remnants of a black eye from bumping into a chair while crawling around.