Saturday, May 31, 2008
Magic Cast On
Hold the 2 needles together (for socks, put the longer one on the top as it will be used for the heels later).
Put the yarn between the needles and up over the top.
Cross the short end over the working yarn in back.
Wrap yarn around thumb and pointer as if you were doing a long tail cast on.
Now you are going to add the stitches. Each wrap is a cast on stitch.
Bring the yarn coming off the pointer around the bottom of the lower needle and around the front and through the middle between the needles.
Now bring the yarn from the thumb between the needles and around the front and behind the needles. (It is the same motion as you did with the other needle)
Repeat the two wraps until you have enough stitches.
Then wrap the short end over the working yarn in back.
For two at once socks, slide the stitches over and do another set of cast on stitches for the 2nd sock. Make sure that the fronts are on the same side!
Turn the needles clockwise, so that the bottom needle is now on the top. Pull the new bottom needle through to the center of the cable. Start knitting with the other end of the circular needle on top.
Here it shows the front after you've knit across both sides (with both needles)
And here is the back. See the Purl bumps? You can't tell where the cast on is! Cool, huh??
Wednesday, May 28, 2008
Two at Once, Toe Up, Gusset Heel Socks
I finished my socks!
This is what I did to make them:
Size: Ladies shoe size 7
Gauge: 6.5 st/9 rows = 1 inch
Needle: 2.75 mm (2 circulars, can be different lengths)
Yarn: Lion Brand Magic Stripes (I used 2 skeins just so I could use 1 for each sock, but 1 skein
would probably be enough)
Remember - you change needles or yarn, but never both at once!
Cast on 8 stitches for each sock.
R1 - Needle 1 - Knit across
Needle 2 – Knit across
R2 - Needle 1 - K1, M1, Knit across to last stitch, M1, K1
Needle 2 – K1, M1, Knit across to last stitch, M1, K1
Repeat R1 & R2 until you have 26 stitches on each needle for each sock.
Toe increases are done and now we’re ready for the body of the sock.
Knit around on both needles for 30 rows until sock measures 6” from the toe and the sock reaches the ankle.
Gusset increases:
R3- Needle 1 – Knit across
Needle 2 – K 1, M1, Knit across to last
stitch, M1, K1
R4- Needle 1 – Knit across
Needle 2 - Knit across
Repeat R3 & R4 until there are 46 stitches on Needle 2 for each sock.
Heel:
- Needle 1 will rest as you knit the heels.
- Do the 1st sock’s heel completely and then do the 2nd sock’s heel.
- Slipped stitches are done purlwise (as if you were going to purl)
- When I SSK, I usually slip the 1st one knitwise and the 2nd one purlwise, then insert left needle into front of both and knit together
K 25, SSK, K1, turn
Slip 1, P 6, P2tog, P1, turn
Slip 1, K 7, SSK, K1, turn
Slip 1, P 8, P2tog, P1, turn
Slip 1, K 9, SSK, K1, turn
Slip 1, P 10, P2tog, P1, turn
Slip 1, K 11, SSK, K1, turn
Slip 1, P 12, P2tog, P1, turn
Slip 1, K 13, SSK, K1, turn
Slip 1, P 14, P2tog, P1, turn
Slip 1, K 15, SSK, K1, turn
Slip 1, P 16, P2tog, P1, turn
Slip 1, K 17, SSK, K1, turn
Slip 1, P 18, P2tog, P1, turn
Slip 1, K 19, SSK, K1, turn
Slip 1, P 20, P2tog, P1, turn
Slip 1, K 21, SSK, K1, turn
Slip 1, P 22, P2tog, P1, turn
Slip 1, K 23, SSK, K1, turn
P 24, P2tog, P1, turn
Knit across
You can see the light blue stitches in the middle are the ones I’m working with and the dark blue and white ones on either end are the ones waiting
You should now have 26 stitches on the bottom needle again
Knit around on both needles for 16 rows (or until the sock is as tall as you want)
Ribbing:
Needle 1 - *Knit 2, Purl 2* across
Needle 2 - *Purl 2, Knit 2* across
Repeat for 8 rows.
Cast off with stretchy cast off.
Sunday, May 25, 2008
Gardening Time!
Here is how the garden looks after the end of the season last year.
I used driveway markers (for winter) to mark the boundaries of the garden. Last year, I just used the dead area from the pool, and this year we squared it up.
I had a volunteer crop growing!
Leaf lettuce!
We made the garden bigger this year because I didn't have to do it by hand! We got a rototiller last week!
After going in one direction, Dan went back the other direction.
Dan admiring his work.
Friday, May 23, 2008
Sailors and Flowers
Sunday, May 18, 2008
Big Girl Bed
Here she is all ready for her first night in her Big Girl Bed.
All tucked in.
Here's Sarah with her bed (She's had hers for a couple years, but I figured I'd take her picture, too!)
All tucked in.
Lily of the Valleys!!
Last year, I got the plants to actually come back the year after I planted them and now this year, I have flowers!! YEAH!
I also really like Violas, too, and those, I don't have a problem growing. They come back all by themselves!
And of course, we also have these lovely yellow flowers all over the lawn!
No Bake Brownies
Here's the kit.
Pour in the powder,
Add water and stir,
Pour into the mold,
Wait 20 minutes, and pop them out! The girls seemed to like them, but I didn't taste them. We have 2 more pouches to make, so I may give it a try next time!
Tuesday, May 13, 2008
How to Avoid Doing the Dishes!
I had accidentally turned on the burner for the front instead of the back. I had a stack of 2 glass cake pans (9x 13) and a 8 x8 square pan sitting in that spot.
The bottom one got so hot, it exploded! So now I don't have to wash it, although I DID have to clean up the glass!